Airtables

How to link records in Airtable, from contacts to projects

Link records in Airtable with one field: which table gets the link field, the settings to decide before Create field, picking records from either side, converting a column of typed names after a backup, subtasks in one table, links across bases through Sync and linking in bulk with an automation.

Two blank catalog cards are joined by a steel paper clip in front of an open wooden catalog drawer.

Linking records in Airtable takes one field. In the table where you keep typing a name, add a Link to another record field, point it at the table that holds those names as records, and fill each cell from the + inside it. Airtable then creates a matching link field in the other table, so a task that names its project also turns up in that project's list of tasks, and the link can be changed from either side.

A spreadsheet lookup reads a value from another tab. An Airtable linked-record field stores the connection to the record itself. An Airtable formula cannot directly reference fields in another table, which Help's introduction to the formula field spells out, so a link is also how lookups, rollups and counts reach the other table.

Linked records work on every Airtable plan. They use the base's record allowance: Free allows 1,000 records across all tables, Team 50,000 and Business 125,000. A new link between existing records doesn't create another record; a new company or junction-table entry does. The steps below use the browser, where the complete field configuration is available.

Where each name should live, and who points at it

A link field records which record you mean, not what that record was called on the day you linked it. Keep each company once, in Companies. If a client called Copperline Print renames itself Copperline Studio, you edit one record, and every contact and project linked to it shows the new name; nobody has to search the base for the old spelling. Typed text can't do that. "Copperline Print" in Contacts and "Copperline Print" in Projects are two independent copies, and they part ways the first time someone corrects only one of them.

Decide which lists connect before adding the field. Say a small design studio keeps client work in four tables. Each row in this plan names one relationship:

TableLink field you addPoints atEach cell holds
ContactsCompanyCompaniesOne company
ProjectsClientCompaniesOne company
ProjectsPeopleContactsSeveral contacts
TasksProjectProjectsOne project

Four fields, and Airtable adds the reverse of each: Companies gains a list of its contacts and another of its projects, Contacts a list of the projects each person is on, Projects a list of its tasks. I'd point a project's Client at Companies rather than at a person, because the company stays the client when the person who signed the brief moves on.

Create the link field in the table that keeps retyping

Check three things first. Both tables sit in the same base; a table in another base takes a different route, covered further down. Your account can configure fields: the linking guide lists Owner/Creator for field configuration, while Editors can link and unlink records in a field that already exists. And the table you point at holds the records, or will once you add them. If you're still deciding between a link and a plain text or single select column, compare them in Airtable field types; the steps here start in Tasks.

  1. Open the base and the Tasks table.
  2. Click the + button at the far right end of the field names. To place the new field next to a particular one instead, click the dropdown arrow beside that field's name and choose ← Insert left or → Insert right.
  3. Find Link to another record in the field types and click it. Typing "Link" in the search bar brings it up.
  4. Choose the table to link to: Projects. Choosing the table you are in makes a self-link, which is how subtasks work (see below).
  5. Name the field Project, decide the settings described in the next section, and click Create field.

Expected result: Tasks has a new, empty Project column, and Projects has a new link field of its own. To verify, open Projects and scroll to the last field, where Help says a link field created from another table usually lands. If it isn't there, check the view's hidden fields: a view with hidden fields can hide the new one too, so show it from the view's hidden fields or open a view that hides nothing. Rename it Tasks if Airtable gave it another name, then open its settings too, which Help lists as a step of its own: the options you just chose belong to the Project field.

An empty field at this point is normal. Creating it establishes the relationship's structure; it doesn't match existing task names to project names. Select the records below, convert existing text, or use the Find records → Update record pattern for a backfill. A lookup also stays empty until specific records are connected.

The settings to decide before Create field

Airtable Project field settings with multiple selection off, a Picker: one record callout, and the paid condition-filter option
Switch Allow linking to multiple records off for the single-record picker. Existing links remain, and automations can still write several links.
  • Allow linking to multiple records. Off restricts new selections in the record picker to one linked record per cell. Turning it off leaves existing links in place, and automations can still create multiple links. Pasting is different: the linking FAQ says a pasted cell with several values stays empty while this setting is off; single-value rows in the same paste can still link normally. Help doesn't say which way the toggle starts, so look at it before you save.
  • Limit record selection to a view. The picker then lists only the records in one view of the linked table, such as an Active projects view filtered by status. It works on every plan. It shortens the list people pick from and nothing more: records outside the view can still be linked by other means, and nothing is hidden anywhere else. Help's steps to limit the picker to one view start by creating that filtered view, then Edit field, the toggle, the Select a view icon, the view, and Save.
  • Filter record selection by a condition. Paid plans only: Team, Business and Enterprise Scale. After the toggle, click Add condition, then the ⚙ icon to choose a Static condition or a Dynamic condition. Help's page on dynamic filtering in linked record fields sets this up in the browser or the desktop apps and says the filter also applies on iOS and Android. These conditions narrow the picker and are also checked on form submission and when an interface-only user edits the linked field. Automations, copy and paste, scripts and API writes do not enforce them. On Free, the view limit above is the route.
  • Show display name instead of primary field. This changes the names shown inside the picker. Automations, the Airtable API and Sync keep using the primary field, so a messy primary field still shows up there.

For a dynamic filter, read the condition left to right: the field on the linked table is compared with a field on the record you're editing. For example, People.Skills can match Tasks.Skills required when both are linked-record fields pointing at the same skills list. The compared types must match; select options need exactly matching names. An empty current-record condition value leaves the picker unfiltered, so fill the prerequisite before choosing the person. Existing links remain visible even if they no longer meet the condition. None of these picker settings is an access-control rule.

Help lists one more option for workspaces where AI is turned on, Use AI to show top matches when selecting a record. It suggests matches inside the picker and doesn't work in automations, so it changes nothing about the bulk route further down.

Pick the records, from either table

  1. In Tasks, click the Project cell of the Draft copy task, then the + icon inside the cell. The linked record picker opens with records from Projects, or from the view you limited it to.
  2. Select Website refresh. Its name now sits in the cell.
  3. Click that name to open the project's expanded record without leaving Tasks.

Expected result: in Projects, the Website refresh record's Tasks field lists Draft copy, though nobody typed anything in Projects. Adding or removing the link in either table updates the corresponding field on the other record.

Airtable Tasks grid with the Project cell of Draft copy selected and the linked record picker listing Website refresh and Spring catalog
Click the + inside the Project cell of Draft copy, then pick Website refresh from the Projects records the picker lists.

Inside a cell, the most recently linked record goes to the end, and a record that is removed and linked again moves to the end too. To change the order, click the cell, then the two-arrow icon or press Shift + Space to expand it, and drag a linked record to its place. Sorting the links of many records at once goes through the Batch update extension (Tools, Extensions, Add an extension, then its Sort links action, Ascending or Descending), which only touches records visible in the view you choose. Extensions need a paid plan workspace; on Free, the drag inside the expanded cell is the route.

Names already typed? Convert the column, after a backup

Suppose Projects has a Client column of typed names. You can convert that field to links, or duplicate it first and convert the copy. Changing an existing field's type preserves the field and its references; deleting it and making another doesn't. Preserved references still need a check: a formula or filter that previously read text may behave differently after conversion.

The conversion can change every cell and create records in the linked table, so keep a comparison copy first. Take a base snapshot from the base history icon → Snapshots → Take a snapshot. Creators and Editors can take manual snapshots. Restoring one creates a new base with a new base ID; it doesn't overwrite the existing base. For a table-level copy, use an unfiltered grid view and download CSV. Keep the original field's values as well when comparing a risky conversion.

When the starting field is a single select, duplicate it with its cell values before converting, and keep a comparison copy until every original choice has the expected link. This conversion can lose cell values, so a row count alone is not a sufficient check.

Then clean the values, because the conversion reads them literally:

  • Several names in one cell must be separated by commas.
  • A name that itself contains a comma needs double quotation marks around it, or it splits into several links. Help's example is "The Lion, the Witch, and the Wardrobe"; a client called Lund, Park and Co. needs the same quotes.
  • A value that matches no record in the other table becomes a new record with that name. Help's rules for pasting into a link field show how strict matching is: spacing, capitalization and punctuation all count. Spell each name exactly as the primary field of Companies has it.
  1. Click the dropdown arrow next to the Client field's name, then Edit field.
  2. Click the current field type and choose Link to another record.
  3. Choose the existing Companies table. If there is no such table yet, click + Create a new table: Airtable builds one with a record for each value and keeps each project linked to its company.
  4. Decide the settings above and click Save.

Expected result: the Client cells hold links, and Companies has a reciprocal Projects field. Compare each converted row against the original and inspect Companies for unexpected new names. Relink projects to the intended company before deleting a stray record. Renaming two company records to the same name doesn't merge their identities or move their links.

Pasting names into a linked record field follows the same exact-match rule, with two exceptions: if the other table's primary field is a formula or another computed type, unmatched values are dropped instead of becoming records, and a synced table without two-way sync accepts no new records at all.

Sample input and targetResult to check
Copperline Studio, matching an existing primary value exactlyThe cell links to that existing record; no new company is needed.
copperline studio, with only Copperline Studio in CompaniesThis isn't an exact match. An editable primary field can receive a new record; a computed primary field can't create it.
"Lund, Park and Co."The quotes protect the comma, so it is treated as one company name.
Website refresh,Spring catalog, pasted while multiple links are offThe multi-value cell can stay empty. Inspect it separately from single-value rows that succeeded.

One-to-many, many-to-many, or a table in between

Airtable describes three relationship types made with links: one to one, one to many, and many to many. The first rarely earns a link; Help suggests keeping two facts that pair one to one as two fields in a single table. The other two describe the project and task relationships here.

One project, many tasks

Each task belongs to one project; a project has many tasks. Link from Tasks, switch Allow linking to multiple records off on the Project field in Tasks, and leave it on for the Tasks field in Projects. Existing multiple links survive switching that toggle off, and automations can still add several projects. A pasted cell with multiple values stays empty while the toggle is off. Check the Project column after imports if every task must have exactly one project.

Contacts on several projects

A contact works on several projects and a project has several contacts: many on both sides, with multiple links allowed in both fields. It still takes only two tables and one link field plus the reverse field Airtable adds, the way Help pairs books with authors. Open any contact and the projects they're on are listed in one cell.

A role on the project: add a junction table

Some facts belong to the pairing rather than to either record. Maya Ortiz approves designs on Website refresh but writes copy on Spring catalog: the role isn't a fact about Maya or about either project. Help's answer for data like this (a student's grade in one class, the quantity of a product on one order) is a third table, a junction table, linked to both sides. A Project roles table for the studio could hold:

Name (formula)Project (link)Contact (link)Role
Website refresh, Maya OrtizWebsite refreshMaya OrtizApprover
Spring catalog, Maya OrtizSpring catalogMaya OrtizCopywriter
Spring catalog, Jonas BergSpring catalogJonas BergPhotographer

The primary field is a formula that joins the project and contact into a descriptive label, the way Help's students-and-classes example combines class, semester and student. Two records with the same project and contact produce the same label, so check duplicate pairings separately. That choice has a cost to plan around: with a formula as the primary field, a pasted name that matches nothing is dropped rather than turned into a Project roles record, and automations can't link to these records by name, so link them through the picker or by record ID. On a paid plan, the Junction Assistant extension can build such a table for you.

Subtasks: link a table to itself

Help documents self-linking for exactly this case, along with managers and team members or projects and subprojects. Tasks gets a Parent task field that points at Tasks.

  1. In Tasks, click the + to the right of the last field (or the dropdown arrow of a field, then ← Insert left or → Insert right).
  2. Search for and select Link to another record.
  3. When Airtable asks which table to link to, choose Tasks itself.
  4. Name the field Parent task and click Create field.
  5. Airtable adds the reciprocal field directly after it, named From field: Parent task. Rename it Subtasks.

I'd switch Allow linking to multiple records off on Parent task and leave it on for Subtasks: a parent has many subtasks, while a subtask answers to one parent. To file Order paper under Proof print, open the Parent task cell of Order paper, click its + and pick Proof print. Expected result: Proof print's Subtasks cell now lists Order paper.

Keep both fields: Parent task and Subtasks show opposite directions of the same relationship. This differs from a symmetric “related tasks” list in which both records should appear in the same field. A native self-link creates the To/From pair; don't delete its reciprocal field to make the layout look simpler. Hide the field in a view if people don't need to see it.

To see the tree as a tree, use a list view with nested records: under Set levels, choose Enable nested records for level 1. Each subtask then sits nested under its parent. Dragging one record from the same table onto another nests it and writes the link into the backlink field, here Subtasks, up to 7 additional layers below the top. Owners, creators and editors can add or change list views.

Airtable list view of the Tasks table with Order paper and Check colors nested under Proof print, each showing Proof print in Parent task
With Enable nested records chosen under Set levels, Order paper and Check colors sit under Proof print, the task their Parent task field points to.

When the other table sits in another base

A link field stays inside one base, by Airtable's own account: its Sync FAQ says Airtable doesn't support linking records across bases and suggests keeping related tables in the same base. When both tables serve the same team, that is the route, and it works on every plan.

When the second base has to stay separate, Sync brings a copy of a table across, and you link to that copy. Sync is unavailable on Free. The Sync plan table gives Team one-way sync and Business and Enterprise Scale two-way sync. In the source base, the view that will be shared starts it: Share and sync, Sync data to another base, then toggle on Allow data in this view to be synced to other bases. Creating the synced table needs creator permission in the destination base. The full route is on the page about how to link a table from another base with Sync.

There are two supported cases, and they need different treatment. Airtable's guide to links across synced bases separates them:

  • Preserve the source's relationships. Sync both linked tables together with the linked-table option. If the destination already received a source link as text, first sync its linked table, then use Convert to linked records on that synced text field. This requires a single-source Airtable-to-Airtable sync. The field can remain empty until the next sync rebuilds the links by record. Check formulas, filters and automations that used its text values.
  • Create a relationship local to the destination. Add your own Link to another record field and point it at the other table in this base. Match existing primary values or use record IDs to fill it. The added field survives refreshes, but new arrivals need their own linking step. Local links don't write back to the source.

Don't use ordinary Customize field type as a substitute for that supported conversion: the original field still receives source values and can have its locally rebuilt links overwritten. Synced linked-record fields also exclude multi-source syncing on the connected tables. If several source bases contain the same project name, give the matching key a source identifier before rebuilding local links.

Check the sync's record-retention setting before changing the source view. With Delete the records in this table, a source deletion or filter can remove destination records and their local links. With Leave the records in this table, the unavailable records remain until removed. Once a destination record is removed, the lookups and rollups that depended on its links lose that input.

Link records in bulk with an automation

A new link field is structure only. Records connect when someone picks them, or when an automation writes the links, which is the route for hundreds of tasks imported with a typed project code. Help's automation pattern for linking existing records uses a checkbox as the switch. Creating automations is for owners and creators; how many runs each plan allows is on the page about Airtable automations. The automation writes into many records, so open an unfiltered grid view of Tasks and download its CSV first, the same way as before a conversion.

  1. Add a checkbox field to Tasks, for example Link now.
  2. Create an automation with the trigger When record matches conditions, with these conditions: Link now is checked, Project is empty, and the typed project code is not empty.
  3. Add a Find records action on Projects that finds the project whose unique field matches the task's typed code.
  4. Add a conditional group after Find records. Set the condition to Length of Records equals 1, so the update runs only when the code identifies exactly one project.
  5. Inside that group, add an Update record action on Tasks, take the Record ID from the trigger, and set Project to the record Find records returned, as a new list of Airtable record IDs. With zero or several matches, leave the task unchanged and correct its code or the duplicate project records. Then uncheck Link now and check it again so the task re-enters the trigger conditions.

Before turning the automation on, test the trigger, Find records, the conditional group and Update record with one sample task. The action test writes a real link, so inspect that task and its project before continuing. Once the automation is on, check Link now on a separate unlinked task whose code matches exactly one project. Expected result: Project fills with that link, and the project's Tasks field lists the task as well. Try two or three tasks and inspect their Project cells before continuing. This design starts a separate automation run for each task that newly meets the trigger conditions. Update record replaces the existing list of links; the Project-is-empty condition keeps this backfill from overwriting links already assigned.

The trigger isn't retroactive. Records checked before you turn it on won't run just because they already match: uncheck and recheck the dedicated Link now field after enabling it. For the sample task used in an action test, Project may already be filled; use another unlinked task for the live check. Check both the task's Project and the project's Tasks field, then check the run history before expanding the backfill.

If you need to append links to an occupied field, this empty-field backfill is the wrong configuration. Update record replaces the list you write. For a nonempty field, supply its existing record IDs, a comma, then the new IDs; use a separate empty-field branch that writes only the new IDs. An empty token plus a leading comma can fail validation. Every ID must belong to the table the field points at: finding Tasks doesn't supply valid Project IDs just because those tasks link to projects.

Linking by record ID is what Help recommends, and the same article explains why. Writing plain text into a link field from an automation needs an exact match with the other table's primary field and fails outright when that primary field is a formula; text that matches nothing quietly creates a new record instead of raising an error.

Forms have their own shortcut. A form URL can fill a linked record question in advance with prefill_Project=recXXXXXXXX, a real record ID in place of the placeholder, and several IDs separated by commas with no spaces, per Help's page on prefilling a form through its URL. Building the form itself is covered under Airtable forms.

A prefilled URL creates a new submission with that selection; it doesn't edit the existing project. Treat prefilled and hidden values as editable URL data, not as proof of a submitter's identity or permission.

Deleting a link field, duplicating a linked record

Unlinking a record removes that relationship from both sides, while both records remain. Deleting the target record removes the record itself and the links pointing at it. Check whether the task is to detach one project or remove the company before using Delete.

Removing a link field takes no records with it, yet it unpicks everything built on top. Under Airtable’s field-deletion rules, the reverse field in the other table turns into single line text holding the linked names separated by commas, and every lookup, rollup and count that read through the link stops working, along with view filters and sorts, automations and interface elements that use it. If it happens by mistake, restore the field from the base's trash: that brings the links back, while a new link field starts empty. On paid plans, the Dependencies column in Manage fields shows what relies on a field before you delete it.

Duplicating a record copies its links too, so the duplicate (often with "copy" in its name) appears in the other table's link cells next to the original. Rename it or unlink it before anyone picks the wrong one.

Read the linked records: lookup, rollup and count

With the links in place, the other table's details can show up without being typed again. A lookup field shows values stored in linked records. In Projects, it can list the due dates of linked Tasks records. A rollup runs a calculation over those values; a count reports how many records are linked. The setup and the results each one gives are on the page about lookup and rollup fields, and the other guides on fields and linked records sit next to it.

If the link chip is present but the lookup is blank, open that exact linked record and check its source field, then check the lookup's chosen link, chosen field and optional inclusion condition. A lookup reads through actual linked records; it can't repair an empty link or read another row merely because the names look alike. For a longer diagnosis, use the missing lookup values checklist.

A count gives you a quick check of the links. In Projects, add a count field, choose the Tasks link as the field it counts, and name it Number of tasks. With Draft copy linked to Website refresh and no other tasks linked to that project, its count is 1. The count changes whenever a task is linked or unlinked from either table.