Run a project in Airtable by keeping each task in one Tasks record, linking it to a Projects record, and giving it an owner, due date and status. A Kanban board and calendar then read those same tasks. I'd start with those views because they keep one task list to maintain, then add project progress, reminders or role-facing interfaces where they answer a real question.
The Free route includes a basic Kanban board and a calendar using one date field. Its published limits include 1,000 records per base, five collaborators with Owner, Creator or Editor permissions, and 100 automation runs per workspace per month. Projects, Tasks and People all draw on the same base's record allowance. Paid Timeline or Gantt views are a separate choice.
Airtable fits projects whose tasks need to connect to other business records and whose team can maintain the setup. If you need a ready-made scheduling or capacity-planning workflow, make that a separate buying requirement before building this tracker.
Download the project starter data
Download the project tracker CSV pack: three Projects, three People and six Tasks, with a README explaining field types and links. The records are fictional. You configure the views and assignments in your own base; the files do not enable reminders or invite anyone.
For a native app you can copy into a workspace, choose Airtable's project tracker template. Use the small CSV example below if you want to understand each relationship before adding more reporting or workflow rules.
Keep projects, tasks and people in their own tables
Build this example on desktop or in a browser with Owner or Creator permissions. Catalog launch is one Projects record; Approve product copy and Check product photographs are separate Tasks records linked to it. Airtable's linked-record model keeps related lists separate while connecting them.
Projects and Tasks are enough for the core tracker. Add People only when you need directory facts such as an external reviewer's role or contact details. The CSV pack includes that optional table so you can see how a directory differs from an Airtable account.
A small project base
| Table | One record represents | Suggested fields |
|---|---|---|
| Projects | One project | Project name as the primary field; a short brief and target date |
| Tasks | One piece of work | Task name as the primary field; Project link; Person link; Owner user field; Due date; Status single select |
| People | One person in the working directory | Name as the primary field; role and contact details needed for the project |
The Person link and Owner have different jobs. Person links to a People directory record, which can describe an external reviewer without inviting them to Airtable. Owner is a User field for the Airtable collaborator responsible for the task. A directory record does not create an account, grant access or become a billed seat merely because it exists.
I'd keep one accountable Owner per task here, because a board card needs a clear next person. Keep project details in Projects rather than repeating the brief in every task. Use a lookup later if task readers need to see a project fact without maintaining another copy.
- Create a new empty base. Use + Add or import → CSV file, choose Projects.csv and click Upload file. Import it as a new table named Projects. Repeat with People.csv and Tasks.csv as separate tables named People and Tasks. If the import asks for a destination, choose Create a new table, then Next. Keep Use the first row as headers on and Auto-select field types off. Keep the first column as the readable primary field and the ID columns as text. Check the preview, then click Import.
- Set Projects.Target date and Tasks.Due date to Date, People.Email to Email, and Tasks.Status to Single select. Use Ready, Doing, Review and Done as the sample options.
- Once all three tables exist, open the Tasks.Project field's dropdown and choose Edit field → Link to another record. Select the existing Projects table, turn off Allow linking to multiple records for this one-project-per-task design, and click Save. Convert Tasks.Person to link to the existing People table. Do not choose Create a new table.
- Add a separate Owner field with the User field type and allow one collaborator per task. Assign existing responsible collaborators deliberately. The sample People records and their placeholder emails do not populate Owner or invite users.
- Open Catalog launch in Projects and inspect the reciprocal links: it should connect to its three tasks. Confirm three Projects, three People and six Tasks, with no extra records created by mismatched names.
Before adapting an existing base, preserve a backup. Reimporting these files can add duplicates. The CSV import guide explains previews and matching; an unmatched linked value can create another target record. Review plan-specific collaborator billing before inviting anyone new: Team bills base/workspace collaborators with Commenter or higher permissions; self-serve Business bills Editor or higher. A People directory entry is separate from those grants.
Those links describe relationships, not scheduling rules. For another layer of work, the linked-record guide explains how to connect records without turning a pasted name into a second directory.

Use a direct Status field for the board
Give Status a small set of single-select options such as Ready, Doing, Review and Done. These are example stages, not mandatory Airtable values. A direct Status field lets the board edit the task's actual stage. Agree what Done means before using it as a progress measure: for this example, the output has been accepted, rather than merely sent for review. Keep the next responsible collaborator in Owner when work changes hands.
The Kanban setup is available on all plan types. Owners, Creators and Editors can create and modify views; personal and locked collaboration modes have their own plan conditions. For this team board, use a collaborative view.
- Open Tasks and expand the Views sidebar if needed. Click + Create new..., then Kanban.
- Name it Task status, select the collaborative mode, and click Create new view.
- Choose Status as the stacking field, then click Done.
- Open Customize cards and show Owner and Due date. Use Stack by if you need to change the stacking field, then confirm with Done.
Blank Owner or Due date fields do not appear as empty lines on Kanban cards. Check the grid when you need to find missing assignments or deadlines.
Kanban stacks use one single-select, user or eligible linked-record field at a time. A linked field must have multiple linking turned off. It doesn't offer a second grouping level, and a formula or lookup isn't the direct stacking field for this design.
Moving an editable card between stacks changes its Status value. If a board instead uses a single select copied from a computed field, a manual move can leave that copy out of step with its source. Keep Status directly editable here and respect any field-edit permissions. Hiding a field on the card changes presentation; it doesn't restrict access to the underlying task data.

Make an Open work grid for the current project
Keep an unfiltered Tasks grid for checking the full list. Create a second grid view over the same table: choose Create new..., then Grid, name it Open work, choose collaborative mode and click Create new view. This view selects tasks from Tasks; it doesn't create another task list to maintain.
Apply two filter conditions, joined with And. Set Project to has any of and select the Catalog launch record. Set Status to is any of and select Ready, Doing and Review. Both conditions must hold. The linked Project field uses a different operator from the single-select Status field, even though this design allows only one project per task.
Choose Sort, select Due date and use earliest to latest. Keep Automatically sort records on so a changed deadline moves the row into its new position. That sort applies to Open work; other views keep their own order. Leave undated tasks visible so missing deadlines remain a planning decision.
A Done task leaves this filtered view but stays in Tasks. An empty Status or missing Project link also fails these conditions. If a task disappears, check it in the unfiltered grid and inspect those fields before creating a replacement. View filters hide records from that view; they don't delete them or reduce an existing collaborator's base permissions.
With the starter data, Open work should show Approve product copy and Check product photographs. Confirm catalog brief is already Done, and the other three tasks belong to different projects. Check product photographs has no due date, so it stays in the grid and remains unscheduled on the calendar.

Use Due date for the Free calendar
A basic calendar view needs at least one date field and is available on all plans. In Tasks, use Due date as that field. Paid plans can add an end date or additional date fields; you don't need those features to see deadlines on a Free calendar.
- From the Tasks view sidebar, click Create new..., then Calendar.
- Name it Deadlines, choose the collaboration type, and click Create new view.
- Select Due date as the calendar's date field and click Done. Check that a task with a due date appears on that date and that an undated task remains unscheduled.
Dragging a calendar card edits the task. Moving it to another day changes Due date in every view. Dragging it into the sidebar clears that date. Agree who can reschedule work before using the calendar as a planning surface.
For durations and dependencies, Timeline and the dedicated Gantt view are documented for paid plans. Timeline places records across time and can group them into lanes; Gantt shows task durations and dependencies. Stay with the board and Due date calendar if a duration chart does not change your decisions.
Count project progress from all linked tasks
The board answers where tasks are. A project lead also needs to know how much work is still open. On Projects, use the reciprocal Tasks link to count all related tasks and the subset marked Done. Count fields are available on all plans and need an existing linked-record field.
- Open Projects and find the reciprocal field containing each project's linked tasks. Name it Tasks if its current label is unclear. Open Catalog launch and confirm the three task links before counting them.
- Click the + beside the rightmost field, choose Count, and name it Task count. Under Choose a field in this table, select the Tasks linked-record field, then click Create field. Leave this count unconditional.
- Create another Count field over that same Tasks link and name it Done count. Open its Edit field settings and enable Only include linked records from the Tasks table that meet certain conditions. Set the linked task's Status is Done, then click Save. These conditions belong to the Count field; filtering a Tasks view does not set them.
Catalog launch before you change the starter records
| Linked task | Status | Due date |
|---|---|---|
| Approve product copy | Ready | December 2, 2026 |
| Check product photographs | Review | Blank |
| Confirm catalog brief | Done | December 1, 2026 |
The expected result is Task count = 3 and Done count = 1: one of three tasks complete, with two still open. One open task has no date. The Open work grid shows those two unfinished tasks; the project's count must still include the Done task. If the totals disagree, inspect the reciprocal links and the Count field's conditions before changing the data.
One of three tasks complete doesn't mean a third of the effort is finished or that the launch is ready. A copy approval and a full photo review may take very different amounts of work. Treat these counts as a check on task completion; assess the project's promised output and remaining blockers separately. For larger outputs accepted independently, such as a finished catalogue and a separate launch campaign, add a Deliverables table only when that extra level has a clear job.
Once the counts reconcile, the dashboard guide shows how to present them alongside a list of records needing attention. A new chart won't correct a missing task link.
Review missing information before chasing deadlines
Keep the unfiltered Tasks grid as your recovery route. Before a project check-in, use it to find work that a polished board or calendar can leave out. Make each exception lead to a decision:
- No Owner: agree who is responsible for the next action. A filled Person directory link does not settle the Owner assignment.
- No Project or Status: repair the relationship or classify the task. These records fail the Open work conditions and can disappear from that project review.
- No Due date: decide a deadline or explicitly leave the work unscheduled. Check product photographs is the example to catch here; it is still open even though it has no date on the calendar.
- Past its due date and unfinished: confirm the remaining work and either agree a new date or escalate the blocker. Moving the card changes the stored deadline, so keep the reason with the task rather than quietly making the delay disappear.
- Waiting in Review: name the person who must accept the output and record the question or change they need to resolve. Keep a short blocker/next-action note on the task when Status alone cannot explain the handoff.
I would resolve these exceptions before interpreting a completion percentage. A missing date is actionable; an impressive progress bar can conceal it. Record the project's acceptance condition and target date in Projects, and have the lead compare them with the remaining tasks at each check-in.
Add one reminder for a real handoff
An Owner or Creator can configure a date-based reminder automation. Start with one clear condition, such as a task's Due date matching today, and decide who needs the message. This is an automation configuration, separate from placing a card on the calendar.
Open the base's Automations area and create an automation with When record matches conditions. Select Tasks and configure the date condition. Test the trigger with a suitable sample record before configuring values taken from that record. Then add the email or notification action and inspect its recipient and message. For the native Send email action, use Generate a preview to check values without sending; choosing Run as configured and clicking Run test sends a real message to every resolved To, CC and BCC recipient. On Free, every recipient of this native action must be a verified collaborator in this base; a placeholder address in People is not eligible. Enable the automation only after a controlled test matches the intended task and recipient. Use the email reminder walkthrough for the action's recipient limits and full setup.
For the due-date reminder, add the same unfinished Status options with And so a completed task doesn't qualify. The trigger runs when the record changes into the matching state. Turning it on doesn't process tasks that already matched, and a task that stops matching then qualifies again can trigger another message. Review those existing tasks separately; this condition doesn't send a fresh daily message while a record stays matched.
A handoff into Review can use a separate Status condition and a named reviewer. Moving a task out of Review and back can notify that reviewer again. For the date-based reminder, check the day boundary too: Airtable documents automation date and time conditions in GMT. Confirm the intended timing before relying on a local-day deadline.
Give each role a useful interface page
A lead might need all open tasks, while a contributor needs assigned work. These are proposed page designs over Tasks. Interfaces are available on all plans, and a base Owner or Creator can create pages. Sharing an interface separately from its base, including interface-only users, requires a paid plan. On Free, keep the base-collaborator route distinct.
For the Owner-based page here, set a fixed page filter comparing the Owner user field with Current user. For the single-user Owner field here, use Owner is Current user. The Person link alone doesn't identify the viewer. A viewer-editable Owner dropdown set to Current user by default can be changed; don't use that default as the page's restriction. Configure the filter on each relevant page and publish the changes; another page doesn't automatically inherit it. Current-user filtering isn't supported on publicly shared interface pages. The Interface Designer guide covers the page setup.
Review existing base access before describing a page as restricted. Inviting someone to one interface doesn't narrow the broader base access they already have. A smaller navigation menu or a hidden card field isn't a substitute for reviewing those permissions.
Decide whether this base is enough for the project
I'd choose this base when project records need to connect to operational data such as products or customers, and the team can maintain the fields and handoff rules. If the buying requirement is a ready-made scheduling or capacity-planning workflow, ask a dedicated-tool candidate to demonstrate that exact workflow before choosing it. Don't assume that a configurable chart satisfies the requirement.
Open Approve product copy from the grid, board and calendar. Confirm its Owner, Due date and Status, and that Project opens Catalog launch. With sample data, mark it Done: it should leave Open work while remaining in the unfiltered Tasks grid. Catalog launch should still have three linked tasks, now with Done count = 2 and one open task. Check product photographs should remain in Open work with its blank date visible. Check its reminder condition and intended recipient before enabling a message.