Airtables

Group Airtable records by project, status and month

Arrange one table into useful groups, keep multi-project tasks visible and derive month headings from the date already stored on each record.

Three woven baskets separately hold wooden spools, steel clips and small rolls of plain paper.

To group Airtable records, open a grid view, click Group and choose the field that defines each section. Use Add subgroup for a second or third level. Grouping arranges existing records; dragging a record between editable groups changes its stored field value.

I'd group tasks by a real linked Project and then Status, because those headings explain both where work belongs and what needs attention. Keep the tasks in one table. A separate table for every project makes the same report harder to maintain, while a grouped view can organize the existing relationships.

Build a grouped task view and check its subtotals

For this example, Tasks contains Task name, a Project link to Projects, a single-select Status and a Number field called Estimate hours. Start with tasks linked to one project each:

TaskProjectStatusEstimate hours
Write briefLaunchOpen3
Approve copyLaunchComplete2
Build landing pageWebsiteOpen5
Check redirectsWebsiteOpen1

Native grouping is available on every plan in Grid, Timeline, List and Gantt views, subject to the availability of the view itself. Owners, Creators and Editors can modify collaborative views; Commenters can configure their own personal views where available. Airtable's grouping permissions and supported views set those boundaries. The steps below use Grid. An Owner or Creator needs to add or change the underlying fields if your table doesn’t have them yet.

  1. Open Tasks and select the grid view you want to arrange. Duplicate it first if colleagues rely on its current configuration.
  2. Click Group, between Filter and Sort in the view bar.
  3. Select Project. Use See all fields if it isn't suggested.
  4. Choose Add subgroup and select Status.
  5. Expand Launch and Website. Check each task's Project link against its group heading.
  6. At the Estimate hours summary, choose Sum. The example's Launch total is 5 hours; Website is 6; the four tasks total 11.

Within Launch, Open has 3 hours and Complete has 2. Within Website, Open has 6 hours. These are calculations from the example rows: comparing both the subgroup and parent totals catches a misplaced task before the report becomes someone's workload estimate.

An Airtable grid with Project as its only grouping field
Choose Project as the first group. The count in each group header reflects the records in that section. View full size.

Choose the hierarchy before adding more groups

Airtable supports three grouping levels: one main group and two subgroups. Project → Status answers “What's happening inside each project?” Status → Project answers “Which projects have open work?” A third level is useful only when someone needs to act on that smaller section.

In Group, use the six-dot handle to move a rule higher or lower. Each rule also has a field selector and an ordering selector. The menu offers expand/collapse controls, a three-dot option to show or hide empty groups, and a trash icon to remove a grouping rule. These are group-configuration controls, rather than actions for deleting the records below a heading.

Keep the three view controls separate. Filter decides which records qualify for the view; Group divides those records into sections; Sort orders rows inside the sections. Sorting tasks by Due date won't turn a Project heading into a ranking by total hours.

With automatic sorting enabled, a grouped grid can still let you drag a task into another group, but it prevents manual reordering within that group. The grouped-grid sorting behavior explains why one drag works while another doesn't. A locked view also needs an Owner or Creator to unlock its configuration.

Airtable groups Tasks first by the linked Project field and then by Status
Place Project first when the team starts from a project. The status groups appear inside each project. View full size.

Create a new heading by setting the record's field

A group isn't an independent folder that you duplicate and rename. Airtable creates groups from the unique values in the grouping field. To show a new Maintenance project, set a task's Project link to the Maintenance record. If that parent doesn't exist, create the Project record first, then link the task to it.

Changing a Project record's name and changing a task's Project link do different jobs. Rename the parent when its identity is the same and only its name is wrong; change the task's link when the task belongs elsewhere. The linked-record guide covers the relationship behind those headings.

Collapsing a group only hides its rows from the expanded display. Removing the grouping rule leaves the tasks in the table. If a task seems missing, expand the groups, check Filter and look in an unfiltered grid before creating a replacement. Also check for a combined heading when the field holds more than one value.

Dragging and adding records can write data

Dragging Approve copy from Complete to Open changes its Status from Complete to Open. Dragging it between single-project groups can change its Project link. That can affect reports and automations using those fields. Check the destination heading and then the stored value; the move does more than tidy the screen.

Creating a task with the add-record control inside an existing group also fills its grouping field. If the group uses the Project link, the new task links to that Project automatically, without an automation. A plain-text Project name only fills text and doesn't establish the relationship. Airtable's grouped-record creation rules describe that inheritance.

For a computed grouping field, such as a formula, lookup or rollup, you can't add a record directly into that grouping. Create or edit the record through an ungrouped input view and fill the underlying fields. A calculated month label, for example, must follow its Booking date; dragging a heading can't rewrite the formula's meaning.

An add-task control inside a Project group doesn't create a new parent Project. If an interface must create both parents and children, use a suitable List hierarchy or a separate parent-creation button. Give the user a clear place to enter each kind of record.

Understand combined groups for multiple values

In a grid, grouping by multiple select, multiple user or a linked-record field that allows several links creates a group for each combination of values. A task linked to Launch and Website doesn't appear once in each of those single-project groups. It appears in a combined Launch, Website group.

TaskProject linksGrid grouping result
Write briefLaunchLaunch
Review shared artworkLaunch, WebsiteOne combined Launch, Website group
Build landing pageWebsiteWebsite

Before changing data, look for that combined section. The task hasn't lost either link. The view is grouping the whole set of values, which differs from asking “show every task associated with Launch.”

For a multiple-select field such as Tags, a paid Timeline view provides Group > Split multiple values into individual groups. With Launch and Website selected, the same task can appear in both lanes while being counted once in the Timeline summary bar. The Timeline grouping instructions describe the split and its counting behavior. Grid doesn't offer that switch, and Timeline's Gantt layout disables it.

Take care when dragging Timeline events between lanes: Airtable replaces their current grouping values with the target group's values, rather than appending another value. Read the record after the move if its full selection matters.

If Launch and Website need different deadlines, estimates or completion states for shared work, I'd create a Task assignment record for each project relationship. Each assignment links one task and one project and holds the values specific to that pairing. One task with two links still has only one task-level deadline. The junction-table approach gives those separate facts a place to live.

Group dates by month without mixing years

Use the date already stored on each booking. A manually typed Month column can disagree with Booking date, and grouping by November alone combines November from every year.

For a compact reporting label, add a Formula field named Booking period:

IF({Booking date}, DATETIME_FORMAT({Booking date}, 'YYYY-MM'))

Group on Booking period in ascending order. The guard leaves an empty date without a period label. YYYY supplies the full year and MM the two-digit month, as defined in Airtable's date-format specifiers. The result is text; it remains a reporting label, while Booking date stays the editable date.

Example Booking dateRevenueBooking period
November 8, 2026$4002026-11
December 3, 2026$6002026-12
November 8, 2027$3002027-11
EmptyNot assignedEmpty

Choose Revenue → Sum for each period. The two November bookings stay in different groups; grouping only by the month name would show $700 together. Keep undated bookings in a separate completion view so an empty reporting period doesn't silently become an accepted reporting category.

For expandable year sections with month subgroups, create two Formula fields instead:

IF({Booking date}, YEAR({Booking date}))

Name that field Booking year. In a second Formula field named Booking month, enter:

IF({Booking date}, MONTH({Booking date}))

Group by Booking year first, then Booking month, both ascending. MONTH returns a number from 1 to 12, so the subgroup sequence follows the calendar. For a separate quarter report, use Q as the quarter token alongside a year grouping. For ISO weeks, pair GGGG with WW; a week-year can differ from the calendar year around New Year. Don't combine a week number alone across several years.

If Booking date includes a time, grouping by the raw field also groups by that time. For a day-only label, format it as YYYY-MM-DD. Agree on the reporting time zone before deriving day or month boundaries from timestamps. The date-formatting guide covers SET_TIMEZONE inside DATETIME_FORMAT when the report must follow a specific local calendar.

Airtable groups Booking month separately as 2025-11 and 2026-11
This example separates November 2025 from November 2026. The table above uses the same rule for November 2026 and November 2027. View full size.

Use group summaries for inspection and fields for reusable totals

Every group has a record count and summary bar. Click the summary under a field to choose the measure: Sum or Average for hours, an earliest date for deadlines, or Filled/Empty to inspect completeness where available. The available functions depend on the field type.

Check what the summary is measuring before comparing it with another report. Filtering changes the records included in the view. Selecting a range of rows or cells also limits the summary to that selection. Airtable's summary-bar rules distinguish these displayed calculations from record values.

A summary is metadata: a record-level formula can't reference it. If you want to filter projects to those with nine or fewer tasks, or trigger an automation on a project total, make that total a field on Projects:

  1. Confirm that Tasks links to Projects and that each Project has the reciprocal Tasks link.
  2. On Projects, add a Count field named Task count and choose that Tasks link as its source.
  3. Filter a Projects view on Task count, for example is less than or equal to 9. Add is greater than 0 if empty projects shouldn't qualify.
  4. For hours instead of record count, add a Rollup using the Tasks link, Estimate hours and SUM(values).

Airtable's Count field counts linked records, and a Rollup aggregates their selected field. A filter in a Tasks view doesn't redefine which records are linked to a Project. Use conditions on the Count or Rollup when the total should include only a qualifying subset, and make that rule match the report.

If the task view itself must show only qualifying projects, add a Rollup on Tasks using the Project link, the parent’s Task count field and MAX(values). Name it Project task count, then filter that numeric result using the same limits. This route assumes one Project link per task. With several links, MAX returns the largest project count, which answers a different question. The lookup and rollup guide explains how to choose the returned value deliberately.

For “projects with the oldest work first,” add a Created time field on Tasks if you don't already have one. On Projects, create a Rollup named Earliest task, using Tasks → Created time and MIN(values). You can now sort Project records by that stored aggregate.

To keep the grouped Tasks view, add another Rollup on Tasks named Project first task, using Project → Earliest task and MIN(values). With one Project per task, this brings that parent's timestamp back to every child. Group first by Project first task, ascending, then by Project. The second level keeps separate projects identifiable when their earliest timestamps match; Status can be the third level. This follows the parent-aggregate and child-grouping approach, with an explicit project subgroup. Sorting child rows alone doesn't rank the parent headings.

Configure interface grouping on the interface page

An interface visualization keeps its own grouping configuration. In the interface editor, select the visualization and open Group by in its properties. Current List visualizations support up to two grouping fields; Grid supports up to three. Don't assume a Gallery has the same controls.

The current visualization properties are the reference for these limits. Publish configuration changes and check the page as an intended user. Organizing fields into sections inside one record is a separate layout task from grouping several records into project or status sections.

Before handing the view over, inspect one ordinary task, one task with several values and a new task entered inside a group. Compare the headings with the stored links and statuses, then reconcile a subtotal from the visible rows. A view someone else can explain is ready to use; another subgroup won't repair an unclear relationship.